Context
WebsiteCapture the site, shape the install and leave the client with three clear options.
Build Quote
1. Quote path
2. Site inspection details
1. Choose the job
2. Show the site
A few clear photos beat ten minutes of typing. Photos save straight to this ServiceM8 job diary.
2. Split system scope
3. Existing split system check
For replacements, confirm the existing unit has been effective before matching size. If it has struggled, note why before selecting the replacement.
4. Rooms and equipment
2. Ducted scope
3. Home layout
Count the spaces that need air conditioning. The outlet estimate can be adjusted before quoting.
3. Existing ducted system check
For replacements, do not resize from floor area first. Start with the existing unit, confirm how it has performed, then choose a suitable replacement.
4. Equipment and controls
5. Ductwork and replacement materials
6. Notes
2. Room construction
Enter internal room measurements. Standard coolrooms use 75 mm panels; uncovered outdoor coolrooms use 100 mm walls; freezers use 150 mm.
3. Conditions and product
4. Refrigeration equipment
Equipment is selected by catalogue duty. Product codes are matched exactly to current ServiceM8 materials and prices.
2. Manual scope capture
Quote options
Review the three stocked options with the client. Adjust the unit size here if the site assessment calls for it, then save the quote pack and send the acceptance link from ServiceM8.
